Los Angeles, California
Davis · Yolo County · California

Davis Mobile Commercial Kitchen & Portable Kitchen Trailer Rentals

Plan a Davis mobile kitchen rental around the operator's actual address, menu, meal volume and shutdown dates. The City and local reporting document January 2023 storm outages, food loss at a University Mall grocery store, current developments and municipal facility work. Those records do not establish a present restaurant outage or a Mobile Kitchen Manufacture rental assignment. Before selecting a trailer, verify the receiving pad, vehicle access, utility capacity, fire access and contractor schedule. Ask Yolo County Environmental Health which review applies to the proposed setup. Commercial dishwashing and refrigeration are supporting rentals when the food-service plan requires them. The published equipment figures are Los Angeles base prices; delivery, collection, setup and other charges need a separate quote.

Neighborhoods, public facilities and project sites below are planning references, not confirmed customers, staging locations, service districts or delivery routes.

City, County and project records

Davis kitchen rental planning

01

January 2023 storms caused Davis power interruptions and food loss

The January 7 and 8, 2023 storms brought high winds and rain to Davis during a longer Northern California storm sequence. UC Davis reported that downtown and many other Davis locations were without power on January 9; the campus separately listed residence halls and West Village buildings affected by outages. The California Aggie reported that the City opened the Veterans Memorial Center for charging, water and restroom access from January 9 through 13, and quoted a University Mall grocery employee describing spoiled perishables after a storm outage. Those records establish a real interruption and food loss, not damage to every Davis restaurant or a rental deployment by Mobile Kitchen Manufacture. CBS separately documented a January 17 weather-related outage affecting more than 1,400 West Davis customers, with nearly all power restored by 7:45 p.m. The events are historical. During a future outage, operators should follow utility and public-health guidance on temperature control, verify safe food disposition, and confirm building power, refrigeration and any required health inspection before reopening.

02

City records list several Davis developments under construction

The City's major development register lists 4630 Fermi Place, the Cannery Marketplace mixed-use district, The Lumberyard at 500 G Street, Palomino Place and other projects as under construction. The April 2026 Fermi Place hearing notice describes a proposed 12,000-square-foot manufacturing and office building plus a 2,400-square-foot storage building; a hearing notice is not itself a construction permit, so confirm the later project status. The City announced a June 29, 2026 construction start for Palomino Place. Its July notice for 500-512 G Street set demolition for mid-July through mid-August and grading for late August, and described temporary sidewalk and street closures. Those demolition dates have passed; the City's current project register still identifies The Lumberyard as under construction. None of these notices identifies a restaurant shutdown or temporary kitchen requirement. Before planning a commercial kitchen rental near a work site, request the current contractor access plan, receiving entrance, tow turning area, private pad permission, utility schedule and delivery window. Check City traffic notices again on the actual delivery date.

03

The Community Park restroom project includes a concession facility, not a documented kitchen closure

Davis's Community Park Restroom Revitalization page records State approval of the modular restroom plans and Yolo County Health approval of the concession stand. In its March 26, 2026 update, the City expected site preparation in early summer and restroom installation in mid to late June, timed around the school calendar and planned East 14th Street construction. That target window is past, and the page does not confirm whether installation finished. The City's improvement-project list and annual report also describe aquatic facility upgrades and the skatepark project; the City announced the renovated skatepark opened on September 18, 2026, with landscaping scheduled into November. These are public-facility improvements, not proof of a commercial food kitchen renovation. Public records reviewed did not identify a current Davis restaurant kitchen shutdown. For a real tenant improvement, use the City's address-based permit history, ask the operator for its building permit and contractor schedule, and verify whether food preparation will stop. Yolo County's plan review application covers new food facilities, kitchen remodels and certain equipment or menu changes; obtain County direction before planning operations.

04

Use current Davis alerts and confirmed site access, not an assumed emergency route

During the January 2023 outages, the City used the Veterans Memorial Center at 203 East 14th Street as a public charging and basic-support location. That temporary service point was not a commercial equipment staging yard, and its past use does not authorize deliveries there. Davis tells people under evacuation instructions to use official routes and avoid shortcuts; its emergency page links current Yolo County alerts, PG&E outage information, Caltrans road conditions and weather sources. No standing public supplier staging site or road-by-road emergency vendor route to a Davis emergency operations hub was identified in the records reviewed. For a real incident, check the active alert, closure map and instructions from police, fire, public works and the utility before moving any vehicle. For a planned rental, route from the highway exit to the customer's specific receiving entrance only after confirming current road controls, legal truck access and written property permission. The operator must also confirm a private pad, turning clearance, fire access, electrical capacity, potable water, wastewater handling and the County food plan. Public emergency guidance does not establish Mobile Kitchen Manufacture dispatch coverage.

05

Published equipment figures are Los Angeles base prices, not Davis rates

The owner-provided spreadsheet lists one-to-six-day Los Angeles base figures for selected equipment: $4,995 to $7,995 for specified 24-foot mobile commercial kitchen trailers, $4,995 to $5,995 for specified 22- to 26-foot low-temperature dishwashing trailers, and $1,295 to $1,495 for specified 12-foot refrigerated trailers. The figures do not cover every model, establish a Davis price or set a minimum rental term. Delivery, collection, setup, mileage, utility work, permits, taxes and add-ons are quoted separately. Ask for a written quote that names the model, rental dates, exact Davis address, access plan and added charges. The mobile kitchen remains the primary rental; dishwashing and refrigeration are supporting equipment when the menu and site plan need them. Give the operator and County reviewer the proposed menu, meal count, service hours, utility plan and equipment layout before opening. Yolo County says its food-facility plan review has a 20-business-day response period after receiving a complete application and scaled plans. That is a County review timeline, not a delivery lead time or rental availability estimate.

Primary rental: mobile commercial kitchen trailers. Supporting rentals: commercial dishwashing and refrigerated storage when the food-service plan calls for them. Confirm dates and added charges in writing.

General Plan neighborhoods and project sites

15 Davis planning references

The City’s General Plan update documents these subareas and neighborhoods. The references do not establish service coverage or approved trailer locations. Confirm the parcel, jurisdiction, current work, private access, utilities and food approvals before scheduling.

Planning reference 01

West Davis planning area

The Davis 2050 Existing Conditions Report identifies West Davis as one of six city subareas and names Stonegate, Village Homes, West Davis Manor, Aspen, Evergreen, Evergreen Meadows and Bretton Woods within it. The report also notes that the west side of the city is higher than the east, with elevations across Davis ranging from about 60 feet in western areas to 25 feet in eastern areas. Those figures describe the city's terrain broadly; they do not replace a survey of a specific customer's driveway or trailer pad. A mobile kitchen inquiry in West Davis should begin with the exact parcel and its approved commercial use, not the neighborhood label. Measure the tow vehicle path, turning area, overhead clearance and level pad, then check access rules with the property manager. Confirm electrical load, potable water, wastewater, grease handling, refrigeration and handwashing needs against the operator's menu. Keep service vehicles off greenbelts, bike paths and landscaped common areas unless the owner authorizes that use. The planning report is a location reference. It does not show a restaurant outage, a tenant renovation, local inventory, supplier routes or delivery coverage in West Davis.

Davis 2050 Existing Conditions Report
Planning reference 02

Stonegate and Stonegate Lake

The City's existing-conditions report describes Stonegate as a 299-acre West Davis residential subdivision planned in 1968 and built around Stonegate Lake, with a private country club as a neighborhood amenity. That residential land-use context matters when screening a food-service rental request: a neighborhood name alone does not establish that a commercial kitchen trailer can be placed at an address. Confirm whether the site is a permitted commercial or institutional property, and secure written approval from the parcel owner or facility manager before discussing delivery. A site plan should show where the trailer will sit, the full towing approach, vehicle turning movement, accessible routes, fire access, parking impacts and any shared drive or gate. Check surface strength and slope with the site manager rather than assuming the area around the lake is suitable for a heavy unit. The operator should also identify its menu, meal count, dates, power source, water supply, wastewater and grease plan. The General Plan gives neighborhood and acreage context, but it does not document a Stonegate business kitchen project, food-service interruption, service coverage, available unit or approved public staging location.

Davis 2050 Existing Conditions Report
Planning reference 03

Village Homes and its shared open-space network

The City describes Village Homes as a 70-acre West Davis subdivision planned and built during the 1970s and 1980s. Its plan incorporated pedestrian and bicycle amenities, shared open space, rainwater management and community agriculture. Those features shape practical site questions: a contractor should identify a private receiving entrance rather than route a tow vehicle onto a bike path, greenbelt or shared landscape. Ask the property owner to mark the approved pad, access width, overhead clearance, turning space and hours for deliveries. Check drainage and ground conditions after rain, and confirm that the proposed unit will not obstruct an accessible route, a fire lane or stormwater facilities. A temporary commercial kitchen also needs a utility plan that names the electrical connection, potable-water source and approved wastewater and grease handling. Yolo County should determine which food-facility approvals apply to the planned operation; a trailer rental does not by itself satisfy a permit requirement. The General Plan documents Village Homes' design and place within Davis. It does not identify a current food business renovation, tenant outage, rental assignment or vendor access authorization in this neighborhood.

Davis 2050 Existing Conditions Report
Planning reference 04

Covell Park neighborhood and West Covell Boulevard edge

The land-use report places Covell Park in North Davis. It also uses West Covell Boulevard and nearby subdivision edges to describe the city's northern limit, so a Covell Park business inquiry should be checked against the City's parcel and zoning maps rather than inferred from a mailing address. The neighborhood label does not establish a commercial delivery entrance or a legal site for a temporary kitchen. Ask the customer to provide the street address, property contact and any contractor access plan. Then map the receiving route to the actual loading area and confirm vehicle dimensions, turning clearance, pavement capacity, gate hours and private-pad permission. If the approach meets a school, park or greenbelt entrance, confirm vehicle rules and keep pedestrian and bicycle circulation clear. The food operator should list its menu, meal volume, meal periods and planned shutdown dates so the kitchen configuration can be matched to demand. Coordinate electrical capacity, water, wastewater and grease collection with the facility manager. Yolo County determines the relevant food review. The City's report documents Covell Park's planning-area location, not a kitchen renovation, outage, rental price or service commitment.

Davis 2050 Existing Conditions Report and City planning map
Planning reference 05

North Davis Farms and Northstar neighborhoods

The City lists North Davis Farms and Northstar among the North Davis neighborhoods. The report places these subdivisions near the city's western boundary and describes them as established residential areas. For commercial kitchen rental planning, that context is a prompt to verify the actual use and site owner before proceeding. A school, public venue, restaurant or institutional facility has different access controls from a private home, and only the authorized operator can confirm the work schedule. Request a written placement approval and a site sketch showing the tow vehicle's approach, turning radius, trailer operating footprint and emergency access. Check overhead lines and trees, grade, pavement and service-hour restrictions in person. Do not treat a neighborhood road, park lot or greenbelt as an approved staging point. The kitchen plan should document cooking equipment, refrigeration, handwashing, power requirements, water and wastewater arrangements; County Environmental Health should review the proposed food operation. The General Plan is the source for the neighborhood names and geography. It does not report a current North Davis Farms or Northstar food-service outage, restaurant remodel, local availability or vendor route.

Davis 2050 Existing Conditions Report
Planning reference 06

The Cannery mixed-use district and Marketplace

The General Plan report describes The Cannery as a North Davis residential subdivision approved in 2013, with a mixed-use commercial district approved in 2018. The City's major project list identifies Cannery Marketplace as a mixed-use district under construction. These records establish a development context, not a current shutdown in a restaurant or grocery tenant. A vendor or contractor planning temporary food service should verify the tenant's permit, construction stage and operating plan with the property manager. Request the current site logistics drawing and confirm which entrance accepts commercial vehicles, where a trailer may be placed, and whether any road, sidewalk or parking work affects access. Measure the unit's full length and height against the route and on-site pad, including turning clearance and fire separation. Confirm how staff will supply power and potable water, and handle wastewater, grease, trash and cold holding. The County must advise whether a food facility plan review or temporary-food permit applies. Do not direct equipment to a public street, retail parking row or work zone without written approval. The City project register and General Plan document the district; they do not prove a kitchen outage, rental need, local price, stock or supplier coverage.

Davis 2050 Existing Conditions Report and City development project register
Planning reference 07

Central Davis and its established residential blocks

The City's planning report defines Central Davis as a separate subarea that includes Old North Davis, Sycamore South and Oeste Manor. Central Davis has an established street pattern, and each commercial or institutional project still needs an address-specific land-use and access check. Do not use the subarea boundary as a substitute for the site plan. Before proposing a trailer, verify the business location, receiving entrance, property approval, parking restrictions and construction schedule. A written logistics sketch should identify the tow path, turning movement, level pad, overhead obstructions, clearance from fire access and customer circulation. If a site shares access with a school, apartment or neighborhood facility, confirm permitted work and delivery hours with its manager. The kitchen operator should provide menu and meal counts, staffing, operating dates and the timing of its permanent kitchen shutdown. Match cooking and refrigeration capacity to that actual plan; add dishwashing only when the approved workflow requires it. Yolo County can explain plan review and inspection steps. The General Plan's neighborhood descriptions do not identify an active food-facility remodel, an emergency closure, an approved public staging point or a rental service promise for Central Davis.

Davis 2050 Existing Conditions Report
Planning reference 08

Old North Davis and the Bowers Addition grid

The report traces Old North Davis to a ten-block extension of the original Davisville street grid north of present-day Fifth Street. It says the subdivision was originally called the Bowers Addition and began in 1913. That history helps place the neighborhood, but it does not establish a particular building's construction condition or current food-service use. For a tenant project here, verify the parcel, permitted use, loading entrance, driveway width and any street or curb restrictions before selecting a mobile kitchen. Older blocks can contain individual conditions that a general map cannot show, so inspect overhead clearance, turning space, pad slope, pavement, fire access and utility locations with the owner. Keep the planned kitchen separate from sidewalks, bike routes, residential parking and accessible paths. The operating plan should state food types, meal volumes, hours, staff, potable water, handwashing, wastewater and grease collection. Ask Yolo County whether the arrangement qualifies as a food-facility remodel, temporary food service or another permitted setup. The City's report is the source for the neighborhood's age and grid description; it does not confirm an Old North Davis restaurant renovation, outage, delivery route or rental deployment.

Davis 2050 Existing Conditions Report
Planning reference 09

Downtown Davis core between B and H streets

The City's report places the Downtown Davis core roughly between B and H streets and First and Fifth streets, west of the railroad tracks. Downtown has a specific plan adopted in 2022, and its compact business blocks require customer-specific loading and access checks. The January 2023 outages affected downtown and other parts of Davis, according to UC Davis, while The California Aggie reported food loss at a University Mall grocery business after power interruptions. Those reports show why operators should document refrigeration and food-disposition procedures; they do not show that a downtown restaurant currently needs a trailer. For a project, obtain the tenant's permit, contractor schedule and written permission for a receiving location. Confirm delivery hours, lane closures, parking controls, tow clearance and whether a public right-of-way permit is required. Do not use a curb, plaza or parking stall as a staging site without authorization. The kitchen layout should protect pedestrian routes and coordinate power, potable water, wastewater, grease and cold holding. County Health must advise which review applies. The plan and reports provide downtown context, not an active kitchen shutdown or local rental availability.

Davis 2050 Existing Conditions Report and Downtown Davis Specific Plan
Planning reference 10

University Avenue neighborhood and the west side of B Street

The Davis planning report says the University Avenue neighborhood lies west of B Street, alongside the Downtown plan area. Check whether a proposed customer address is inside the City and identify the property manager who controls any shared access. City emergency notices and the January 2023 outage reporting are useful historical context, but they do not establish a current power problem on University Avenue. If a commercial food operator is renovating, align equipment dates with its approved building permit, contractor milestones and County Health review. The operator must state when fixed cooking will stop, whether refrigeration will remain available and how meals will be served from the temporary unit. A delivery drawing should include the truck's approach, turn, loading space, pedestrian and bicycle movement, accessible entry and fire access. Check event-day restrictions and current lane controls before sending a vehicle into a busy downtown-adjacent street. Confirm a lawful private pad and utility access; do not assume a neighborhood or public parking area is available for commercial equipment. The General Plan identifies the neighborhood's location, not a kitchen closure, staging authorization, available inventory or a Davis delivery commitment.

Davis 2050 Existing Conditions Report and City emergency records
Planning reference 11

Aggie Village and institutional-use parcels south of First Street

The City report places Aggie Village south of First Street within the Downtown area and describes its housing and institutional uses as tied to UC Davis. A request near this boundary needs a jurisdiction check: the City report does not convert university property into a City-owned site, and the UC Davis campus itself is a separate landowner and operating authority. Ask the institution or property manager to confirm procurement rules, contractor access, approved receiving areas and utility responsibility. For a temporary kitchen, record menu, meal count, staffing, food flow, rental dates and the period when fixed cooking will be unavailable. Check the exact parcel, project permit, truck route, campus or neighborhood circulation, gate hours, loading clearance and fire-lane restrictions. The pad must be approved for the unit and have a verified supply for power and potable water plus a lawful plan for wastewater and grease. Yolo County should determine whether plan review or a temporary-food permit applies. The location description is from the General Plan, not evidence of an active dining hall or restaurant renovation, food-service outage, supplier assignment or trailer access agreement.

Davis 2050 Existing Conditions Report
Planning reference 12

Old East Davis and the northeast side of the railroad tracks

The General Plan report describes Old East Davis as the part of original Davisville located northeast of the railroad tracks. That location is a planning reference, not a street-level delivery map. For a commercial kitchen request in this area, confirm the customer's actual address, parcel jurisdiction and property control before estimating any move. A site manager should approve the gate, loading entrance, pad, operating hours and traffic plan in writing. The route review should include the rail crossing or underpass used by the tow vehicle, current construction notices, vehicle height and width, turning clearance, pavement and fire access. Do not infer crossing availability from a map or route a trailer through a restricted rail or street work area. The facility should identify its electrical service, drinking-water source, wastewater destination, grease plan, handwashing and cold-storage needs. Share menu and expected service volume with Yolo County Environmental Health so the agency can identify relevant review and operating requirements. The City's neighborhood record establishes Old East's historical location; it does not document a food-service outage, a kitchen remodel, rental demand, local pricing or an authorized emergency route.

Davis 2050 Existing Conditions Report
Planning reference 13

Mace Ranch and Mace Ranch Park

The City places Mace Ranch in East Davis and describes it as a mixed commercial and residential development built in the mid-1990s, anchored by Mace Ranch Park. A park's presence does not make its lot, field or service road available for rental equipment. Event organizers must confirm City reservations, vendor permissions and County temporary-food approvals separately; a business tenant must obtain approval from its own property owner. For a planned mobile kitchen, request the exact delivery address and site sketch, then check whether the receiving location is private, level and large enough for the trailer and tow vehicle. Confirm access hours, parking controls, overhead clearance, turning movement and clearances from park paths, play areas, fire lanes and storm drains. The food-service plan should list meals, hours, menu, staffing, cooking equipment, refrigeration, handwashing, power, water, wastewater and grease handling. Ask Yolo County which plan check or event permit applies. The General Plan establishes Mace Ranch's development context and park anchor, not an active restaurant renovation, a kitchen outage, permission to stage at the park or local delivery coverage.

Davis 2050 Existing Conditions Report
Planning reference 14

Wildhorse neighborhood and eastern Davis boundary

The City names Wildhorse among East Davis neighborhoods and describes the community as a large residential development from the late 1990s, anchored by Wildhorse Golf Course. The report also uses the eastern edge of Wildhorse to describe part of the Davis city limit. A business serving customers near that edge should verify its address and permitting jurisdiction through City parcel and zoning records; the city boundary does not by itself confirm a County or City health approval. If an institution, clubhouse or commercial tenant requests temporary cooking, ask the facility manager to identify the permitted food operation and the exact approved equipment pad. Confirm the supplier vehicle's legal entrance, width, height, turn, grade, surface, scheduled access and fire clearance before a quote. Check golf-course or event operations before using any shared drive or lot. Plan electrical load, potable water, wastewater, grease and cold storage with the building operator and County reviewer. Do not assume a park, course or private road is open to delivery vehicles. The land-use report provides neighborhood context only; it contains no verified Wildhorse kitchen shutdown, outage, rental assignment, local inventory or supplier route.

Davis 2050 Existing Conditions Report and City land-use map
Planning reference 15

Gateway and Olive Drive area in South Davis

The City's report places the Gateway and Olive Drive area in South Davis, between Interstate 80 and the Amtrak railroad, and says the historic Richards Boulevard underpass connects it to Downtown. It also notes that a Gateway/Olive Drive Specific Plan was adopted in 1996. That is useful orientation, but it is not a current tow route or permit approval. Before a Davis kitchen rental, confirm the destination's exact address, current highway and construction conditions, legal rail crossing, vehicle height, turning envelope and property-controlled loading area. Ask the customer or facility manager for written site access and a drawing of the private pad; do not direct a vehicle to the freeway shoulder, transit area, rail property, public plaza or unapproved parking lot. Establish whether the kitchen can connect to the facility's electrical service, drinking water, wastewater and grease systems, and whether a generator or other equipment is permitted. Share the menu and operation with Yolo County Environmental Health for a determination on food-facility plan review. The General Plan documents the area's location and historic plan; it does not confirm a current food project, outage, available rental unit or emergency supplier staging route.

Davis 2050 Existing Conditions Report and Gateway/Olive Drive planning history
Before food preparation

Ask Yolo County Environmental Health which review applies.

Yolo County's food-facility plan review application asks whether the work is new construction, kitchen remodeling, equipment replacement or a menu change. It requests scaled plans and says the County has 20 business days to review a complete submittal. The County separately requires permits and inspections for mobile food facilities. A rented commercial kitchen trailer at a business address is not automatically a permitted mobile food facility or temporary food facility. Describe the actual menu, equipment, parcel, operating plan and connection to any permanent kitchen, then ask County Environmental Health which rules apply. City building, zoning, fire and property approvals remain separate.

For a Davis quote, send the exact address, dates, menu, meal count, trailer dimensions, access sketch and utility details. Mobile kitchens are the primary rental; add dishwashing or refrigeration only when the operating plan needs them. The listed figures are Los Angeles base prices, not Davis rates. Confirm availability, delivery, setup, collection, utility connections and other charges in writing.

Discuss a Davis kitchen rental
Commercial project coordination

Plan from the facility address and current access notice.

Public records establish Davis storm, construction and facility-project context. They do not show which food business needs temporary cooking. Confirm the shutdown, approved pad, utility plan, contractor schedule and County review for the actual address.

Kitchen schedule

Match rental dates to confirmed shutdown, inspection and reopening milestones.

Emergency information

Check City alerts, evacuation instructions, utility notices and current road controls.

Food-service scope

Provide the menu, meal count, service window and staffing plan.

Utilities

Confirm electrical load, potable water, wastewater and grease arrangements.

Trailer access

Measure the tow path, turning area, clearance, pad and approved delivery window.

Supporting equipment

Size dishwashing and refrigeration to the operating plan.

City, County and project records

Sources for Davis project planning

Emergency instructions, project stages, road restrictions and food-facility requirements can change. Recheck the responsible agency for the address and delivery dates.

Request an address-specific rental quote
Los Angeles project desk

Request availability

Share the equipment, city, and timing. This form prepares a text to (323) 352 9859; review it in your messaging app and choose whether to send.

No inquiry is sent by this website. To contact us, open the text draft and send it from your device, or call now.

Call 24/7 support at (323) 352 9859