Los Angeles, California
Lake County, California

Clearlake Mobile Commercial Kitchen & Portable Kitchen Trailer Rentals

Confirm the customer’s water, wastewater, access and food-review requirements before planning a temporary kitchen for a verified project or outage. Check current County and City notices for the address.

Local records and rental planning

What the public records establish

Use City, County and public-health sources to verify conditions at the customer’s address before discussing equipment.

01

The January 2026 Robin Lane sewer spill is under coordinated recovery

Lake County says a 16-inch force-main failure on January 11, 2026 released untreated wastewater into residential areas, drainage systems, Burns Valley Creek and Clear Lake. The City’s incident page says initial impacts affected 58 properties and the expanded area now includes more than 200 properties that rely on private wells. The County Board continued the local emergency on August 18, 2026, citing ongoing response and public-health concerns. The City describes the work as a transition from initial response to recovery and longer-term remediation. These records do not mean every property in the mapped area has confirmed contamination, and they do not report a commercial kitchen outage. Businesses must follow current Lake County health guidance, verify water safety with the responsible agency and not use a private well until officials clear it. A temporary kitchen is not a substitute for a safe water supply, sewer service or public-health authorization.

City incident page and Lake County emergency continuation
02

City road and airport projects remain at different review stages

Clearlake’s Public Review Documents page lists environmental materials for 36th Avenue rehabilitation between Phillips and Eureka Avenue and for road work involving Arrowhead, Burns Valley and Olympic. These records include a June 2025 draft CEQA packet and a September 2025 environmental assessment. The City’s airport page lists a Draft Environmental Impact Report and notice of availability dated June 17, 2026. A draft environmental document is not a notice that construction has started. The Burns Valley Sports Complex page says environmental and design phases are underway, while legal challenges, cost increases and fundraising affect the timeline. Check the newest City documents before describing any project as active or complete. None of the listed public works establishes a private food-facility renovation. For a real rental request, obtain the operator’s construction schedule and utility plan, then confirm whether the proposed location is a private parcel, whether access is approved and which permits apply.

City public review documents, airport page and Burns Valley project status
03

Public records do not establish a current restaurant kitchen remodel

The City and County sources reviewed cover sewer recovery, roadway environmental review, airport redevelopment and a proposed sports complex. They do not identify a Clearlake restaurant or institutional kitchen currently undergoing a remodel that requires rental equipment. Lake County Environmental Health issues permits and reviews plans for retail food facilities, and the County maintains separate material for mobile food facilities. A temporary kitchen serving an existing business may not be classified as a mobile vendor, so ask County staff about the address, operator, menu, cooking process, food storage and intended service before setting a unit. The owner and contractor should document the actual downtime, safe water source, sanitary wastewater disposal, electrical capacity, ventilation, handwashing, warewashing, grease handling and fire clearances. Check City zoning, building and right-of-way rules as well. The current sewer-spill response makes it especially important to confirm water and sewer status with officials rather than relying on a nearby utility map. No private food-facility outage or rental need is verified by the public records linked here.

Lake County food-facility and mobile-food guidance
04

Follow incident control and road notices before arranging a move

Clearlake maintains an Alert Center and a road-closure page; Lake County and the City publish Robin Lane sewer-spill updates and public-health recommendations. Check those sources on the delivery date. The road-closure page currently says there are no pending closures, but that can change and it does not establish that every street is suitable for a trailer. The spill map and health guidance are not delivery directions or commercial staging approvals. During an active evacuation, contamination response or other incident, obey authorities and do not enter a closed or restricted area. For ordinary access, confirm the customer’s address, the responsible road agency and a private loading entrance with the property owner. Measure total vehicle and trailer length, width, height, turning path and pad capacity. Identify approved potable-water and wastewater connections, keep fire lanes clear and arrange a contact for gate access. Do not route equipment through a response zone or use public land as a staging site without written authorization. No source reviewed publishes a Mobile Kitchen Manufacture dispatch route or confirms Clearlake delivery coverage.

City road-closure and emergency information
05

The supplied sheet gives Los Angeles base prices only

The owner-provided sheet lists selected one-to-six-day Los Angeles base prices of $4,995 to $7,995 for 24-foot mobile commercial kitchens, $4,995 to $5,995 for 22-to-26-foot low-temperature dishwashing trailers, and $1,295 to $1,495 for a 12-foot refrigerated trailer. These are not Clearlake rates, rental minimums, inventory confirmation or a delivery promise. Quote transportation, collection, setup, mileage, permits, utilities, tax and add-ons separately for the requested dates and address. A kitchen estimate should include the menu, meal volume, service hours and cooking equipment. Dishwashing planning needs rack volume, wash method and water-heating capacity. Refrigeration planning needs the product load and required temperature range. Provide a site plan, access photos, water source and wastewater plan. Ask Lake County which food and equipment approvals apply before use. The spreadsheet is a Los Angeles base reference only. It does not establish local pricing, equipment availability, emergency response or service coverage in Clearlake or Lake County.

Owner-provided rental rate sheet
Address-level access context

Clearlake streets, projects and response areas

These references point to documented City and County records. Verify current status, utilities and private-site permissions before scheduling equipment.

Planning reference 01

Robin Lane and the mapped incident area

The City’s January 30, 2026 update expanded the Robin Lane sewer-spill incident area as a precaution after review of shallow groundwater conditions. It states that inclusion in the expanded map does not mean contamination has been confirmed at each property. The City’s current incident page describes recovery coordination and says the number of affected private-well properties expanded from 58 to more than 200. A business should check the latest map and speak with Lake County before assuming whether its address is inside the affected zone or whether water is safe. Do not use a private well for cooking, food preparation, cleaning or ice unless the Public Health Officer has cleared it. A temporary commercial kitchen still needs a confirmed potable-water source, approved wastewater handling and health review. Do not deliver into a restricted area or treat a public incident map as permission to enter a property. Confirm current access with the owner and incident officials. The spill record documents an emergency and public-health response; it does not identify a restaurant, establish structural damage or prove that any nearby food operation has requested a rental.

City January 30 sewer-spill update
Planning reference 02

Pamela Lane and private-well advisories

Lake County’s January 16, 2026 public-health notice describes the affected zone by geographic boundaries and addresses private wells, not every Clearlake water connection. The notice advised residents in the described area to relocate until their well was deemed safe and recommended an adequate supply of safe water for those who stayed. That is dated official guidance; follow the newest County instructions and confirm the exact parcel before making decisions. For a food business on or near Pamela Lane, identify whether the building uses a private well or a public water system and get written confirmation of current water status. Do not substitute bottled water for a complete food-facility review or assume that a kitchen trailer can operate without approved handwashing and warewashing water. The site plan should show the approved source, hot-water capacity, wastewater tank or sanitary connection, grease handling and service route. Keep any unit outside a response zone unless officials approve access. The County notice does not document a commercial kitchen outage, property contamination or rental request at a specific address.

Lake County January 16 public-health recommendations
Planning reference 03

Old Highway 53 and the eastern incident boundary

Lake County’s January 16 recommendation used Old Highway 53 as the western boundary of the described private-well advisory area, with Smith Lane to the east and Pond and Bowers roads bounding other sides. The City later published an expanded incident map, so an older boundary description should not be used to decide whether a property is clear. Confirm the current map and water status with Lake County Health Services. Old Highway 53 is also named in the City’s local street provisions, which distinguish local road segments from the state highway network. For equipment planning, verify the exact address, jurisdiction and permitted truck entrance; do not assume a public arterial provides a driveway or a safe place to stop. A trailer requires an authorized private pad, sufficient turning space and approved utilities. Because the incident involved private wells and stormwater connections, confirm that potable water and wastewater arrangements are independent of any affected system. The public-health boundary is for resident guidance, not a commercial delivery route or evidence of kitchen damage.

Lake County public-health notice and spill map
Planning reference 04

Smith Lane and the expanded incident map

The City’s January 30 incident map labels Smith Lane, Robin Lane, Pamela Lane, Pond Road, Burns Valley Road and Olympic Drive around the mapped sewer-spill scope. The map helps residents locate a zone, but it is not a parcel-level contamination finding. The City’s press release says officials expanded the area after consulting a hydrogeologist because groundwater might have moved laterally; inclusion alone did not confirm contamination. A customer near Smith Lane should check current County sampling and health notices for its specific parcel. Ask whether the site relies on a private well, public water or a different approved supply, and document the answer before planning food preparation. A temporary kitchen must not discharge into a storm drain, creek or unapproved septic system. Confirm sanitary wastewater capacity with the site manager and the authority that oversees the connection. Keep delivery vehicles out of active response areas and follow current road restrictions. The incident map establishes local place names and response scope only; it does not establish a kitchen shutdown, safe access, local rental stock or vendor coverage.

City incident zone map
Planning reference 05

Pond Road and Bowers Road boundary area

Pond Road and Bowers Road appear on the City’s January 30 Robin Lane incident map and help orient the area covered by Lake County’s earlier private-well guidance. The County notice describes advisory boundaries using Pond and Bowers as reference points; it does not say that every address between them has contaminated water. The City later widened the mapped area as a precaution. Check the newest public-health notice and direct testing result for a customer’s address instead of relying on a general boundary. If a business requests portable cooking or refrigeration, ask who supplies potable water, whether the site sewer is functioning, and how handwashing, food-contact cleaning, ice and wastewater will be managed. Use a documented private entrance and placement area that remains outside drainage channels and road rights-of-way. Confirm property permission, utility capacity, vehicle access and current emergency instructions before scheduling equipment. Do not move or place a trailer inside a restricted zone without authorization. These road names are geographic references from official material, not evidence that a particular restaurant experienced a loss or needs a rental.

Lake County health guidance and City spill map
Planning reference 06

Burns Valley Creek and connected drainage

Lake County’s January 11, 2026 release says sewage entered the stormwater drainage system and reached Burns Valley Creek, with contaminated water leaking into Clear Lake. The County asked residents and visitors not to recreate in Burns Creek or nearby water bodies between Robin Lane/Pond and Pamela/Old Highway 53. Those instructions were issued during the initial response; check current Lake County health notices for updated conditions. The City’s later page describes continued recovery and monitoring. A creek or storm drain is never a potable-water source or an approved wastewater outlet for a temporary food operation. A site operator must identify a safe drinking-water supply and a permitted sanitary disposal method. Keep the trailer and generator away from drainage easements, creek banks and public recreation areas, and get written landowner approval for private placement. If the parcel uses a well, confirm sampling and clearance directly with Environmental Health. The public notice documents the receiving water and a dated recreation warning. It does not establish that a food business was contaminated or that a trailer rental was needed.

Lake County January 11 sewage-release notice
Planning reference 07

Burns Valley Road between Rumsey and Arrowhead

The City’s September 2025 environmental assessment describes a roadway rehabilitation project beginning at the Burns Valley Road and Olympic Drive intersection and extending to Arrowhead Road at Park Street. It includes roughly two miles of existing roads for pavement work. The public-review page posts that assessment and related site memoranda; it does not serve as a current construction notice. Check the City’s Public Works page and road-closure announcements before choosing a path. Burns Valley Road also appears on the Robin Lane incident map, which makes address-level utility and response checks important. Do not infer that the sewer spill caused a road closure or that the rehabilitation project is underway. For a verified private food-service shutdown, confirm the customer’s location and property rights, then check turning radius, grade, pavement bearing, overhead clearance and available utilities. Keep trailers out of public work zones and creek corridors. The City project record identifies a specific public road segment and review stage; it does not establish an impacted restaurant, approved vendor route or Mobile Kitchen Manufacture delivery coverage.

City road rehabilitation environmental documents
Planning reference 08

Arrowhead Road to Park Street

Clearlake’s public-review file groups Arrowhead Road, Burns Valley Road and Olympic Drive into a road-rehabilitation project. The environmental assessment describes work extending from the Burns Valley Road/Olympic Drive junction to Arrowhead Road and Park Street. The City’s 36th Avenue project is listed separately, so do not combine those scopes. The environmental file is a project record, not confirmation of current construction. Before any trailer move near Arrowhead Road, check the City’s latest road notices and confirm whether the destination uses a public or private street. A parcel entrance must have sufficient width, turning space and overhead clearance for the full unit. Ask the property manager about surface loading and utility access; do not assume that a roadside shoulder can support an unloaded or parked trailer. If the customer has a food operation, confirm its actual closure and Lake County permit requirements. The City documents establish a real proposed roadway project and its corridor limits, not a local kitchen renovation, restaurant outage or equipment deployment.

City Arrowhead, Burns Valley and Olympic rehabilitation documents
Planning reference 09

Olympic Drive from Lakeshore Drive toward Highway 53

The City’s road environmental assessment identifies Olympic Drive work from the Olympic and Lakeshore Drive intersection toward Olympic Drive and Highway 53, outside the Caltrans right-of-way. It also describes four mapped floodway crossings within project boundaries and evaluates roadway overlay work. That assessment is not a statement that the road is flooded or closed today. Check current City and Caltrans notices before planning a commercial move. Olympic Drive is also the address corridor for City Hall at 14050 Olympic Drive and appears on the Robin Lane incident map, so a map reference alone cannot establish the status of an individual building or utility connection. For a temporary kitchen, confirm the business address, authorized driveway, pad stability and operating hours with the owner. Check clearance from overhead wires, street trees and signs, and do not block bus access, sidewalks or emergency lanes. Ask Lake County about potable water and wastewater requirements if the customer is near the affected zone. The project file documents roadway context, not a supplier route, kitchen outage or rental availability.

City roadway assessment
Planning reference 10

36th Avenue between Phillips and Eureka avenues

Clearlake’s Public Review Documents page identifies a 36th Avenue Road Rehabilitation Project between Phillips Avenue and Eureka Avenue and links a draft CEQA packet dated June 12, 2025, plus preliminary plans. These materials establish a planned project review; they do not show that paving is currently underway or that a closure remains in effect. Confirm the latest construction schedule with Public Works before travel. A private food business near this segment must verify its own service disruption, construction scope and operating dates with the owner or contractor. Do not treat street paving as evidence of an interior kitchen remodel. A trailer location needs a private receiving pad, route approval, turning space and adequate overhead clearance. Confirm the unit’s weight against the pavement or driveway and locate water, power and wastewater connections before delivery. If a utility or food-service interruption has occurred, verify its status with the provider and Lake County. The City’s project records provide a specific local road reference, not an approved delivery route or a confirmed rental lead.

City 36th Avenue road rehabilitation review
Planning reference 11

Clearlake Airport redevelopment area

The City’s Airport Redevelopment Project page posts a Draft Environmental Impact Report and notice of availability dated June 17, 2026, along with appendices addressing transportation, hydrology, hazards, biological resources and other review topics. A draft EIR is part of environmental review; it does not establish project approval or construction. Check for later notices, hearing actions and permits before describing the project’s status. Airport access has separate security and operating rules, so no vendor should enter or stage there without authorization from the airport operator. For a food-service operator in the surrounding area, confirm the actual address, project boundary, utility status and planned construction dates. A mobile kitchen must have a permitted private location, approved access and a reviewed water and wastewater plan. Ask Lake County which health classification applies to the setup. The airport review documents offer real local infrastructure context but say nothing about a commercial-kitchen outage, rental demand, equipment stock or supplier route. Keep those distinctions clear when discussing a potential temporary facility with a customer.

City June 2026 Draft Environmental Impact Report
Planning reference 12

Burns Valley Sports Complex and Recreation Center proposal

The City describes the Burns Valley Sports Complex concept as four baseball fields, a soccer or multipurpose field, a recreation center and family activity space. Its project page says environmental and design phases are underway and reports that legal challenges, cost increases and a funding gap have affected the timeline. The page records an environmental document approved by Planning Commission in April 2023 and a later appeal and lawsuit. It does not state that field or building construction is underway now. The project page also links an early notice for activity within a 100-year floodplain, so current review documents and site controls matter. Do not use the park property as a kitchen-trailer pad or assume the project includes food service. A private vendor would need written access permission from the City, a confirmed event or operator, utilities, health approvals and emergency-clearance review. Verify current status with the City before planning around an event. The source supports a carefully qualified public project reference, not a restaurant renovation, catering order or temporary-kitchen rental request.

City Burns Valley Sports Complex project page
Planning reference 13

Lakeshore Drive and San Joaquin Road

The City’s Community Development Block Grant page lists road improvements after the Sulphur Fire, including Lakeshore Drive and San Joaquin Road, among projects funded or awarded. The same page lists future work for Arrowhead Road, Burns Valley Road and Olympic Drive, including curb and gutter where designed. These statements describe City program history and future project priorities, not a current traffic closure or completed scope on every road. Check the latest notices with Public Works and Caltrans before moving equipment. Lakeshore Drive follows a lakefront corridor where public access, drainage and driveway conditions can vary by address. A customer must identify a private pad outside the roadway, shoreline, drainage area and public facilities. Measure the tow path and confirm a turning area that does not require backing into live traffic. Ask the operator to verify food-service downtime and safe utilities separately. The City page provides legitimate road and funding context; it does not document a new Sulphur Fire, an active kitchen remodel, a food-business interruption or a vendor route.

City CDBG project information
Planning reference 14

Dam Road, Sulfur Bank Road and Country Club Drive

Clearlake's local street ordinance designates Dam Road from Dam Road Extension to Lake Street as a 40-mile-per-hour city street and Sulfur Bank Road from Country Club Drive to the city limit as a 45-mile-per-hour segment; Country Club Drive also appears in the City's street list. Those legal classifications are not a recommendation for a long trailer or a statement about current traffic. Confirm restrictions and current conditions with the City before selecting a route. Establish the customer's exact address and whether the road, entrance and pad are public or private. A tow plan must account for vehicle length, turning radius, grade, overhead wires and a safe turnaround. The property owner should identify a legal unloading area and document its load capacity. Verify power, approved potable water and sanitary wastewater before arranging a kitchen. If the site relies on a well, review current Lake County notices and address-specific results. Do not stop on a shoulder or use public land without permission. The ordinance gives road context only; it does not authorize a route or establish kitchen demand, local inventory or supplier coverage.

City local street ordinance
Planning reference 15

City Hall and the Olympic Drive civic campus

Clearlake lists its City Hall at 14050 Olympic Drive. Public Works is responsible for city buildings, parks, drainage, sidewalks, street lights and streets, while Lake County Special Districts owns and operates the sewer infrastructure involved in the Robin Lane incident. That distinction matters when a facility manager asks about service or utility repair: contact the agency responsible for the asset rather than assuming the City controls every water or sewer system. Municipal grounds are not commercial staging areas. Do not deliver equipment to City Hall or another public building without written approval from the department and a confirmed site plan. For an approved public project, establish procurement authority, access hours, contact person, service connections and permit path before requesting a quote. Keep public entrances, fire lanes and accessible routes open. Lake County food review applies to food facilities; ask the County which requirements apply to a temporary setup. Civic address information and agency responsibilities provide useful project coordination context, but they do not establish an equipment depot, emergency staging authorization or commercial kitchen rental need.

City Public Works and emergency pages
Before food preparation

Confirm the setup with Lake County.

Lake County Environmental Health issues permits and reviews plans for retail food facilities. Its mobile-food program has separate requirements. A trailer supporting an existing restaurant may not fit the same category as a vending vehicle, so ask County staff about the operator, address, menu, equipment and service format before using the unit.

Document the safe potable-water source, electrical demand, wastewater method, grease handling, handwashing, warewashing, ventilation and cold holding. Confirm City zoning, building, fire and right-of-way rules separately. Get written property approval for placement, access and hookups. Quote delivery, collection, setup, mileage, permits, utilities, tax and add-ons separately.

Commercial kitchen planning

Verify the address and every utility.

Clearlake’s records document an ongoing sewer-spill recovery, public road reviews and project planning. They do not verify a private kitchen outage, local rental rate, stock or supplier route.

Check water status

Confirm the source and any County testing or health direction.

Verify actual downtime

Get closure and operating dates from the food-service operator.

Approve a private pad

Measure the gate, tow path, overhead clearance and surface.

Plan wastewater

Use a County-approved sanitary disposal method.

Ask the County

Confirm food-plan review and permit requirements before service.

Official and primary records

Sources for Clearlake rental planning

Incident instructions, project reviews, road restrictions and food-facility requirements can change. Confirm current details with the responsible agency, supplier and property owner.

Request an address-specific rental quote
Los Angeles project desk

Request availability

Share the equipment, city, and timing. This form prepares a text to (323) 352 9859; review it in your messaging app and choose whether to send.

No inquiry is sent by this website. To contact us, open the text draft and send it from your device, or call now.

Call 24/7 support at (323) 352 9859